EXTRUSION OPENINGS ON BOTH DAY 7 AM TO 7 PM OR NIGHTS 7 PM TO 7 AM ON ROTATING DAYS (on a set schedule). Opportunity for growth based on performance with multiple levels within the department. Pay commensurate with experience.
Job summary |
|
The Assistant Tech 1 supports the main Extrusion Technician by packing finished goods, including stacking sheets and wrapping and strapping rolls as per the packaging specification. They will be responsible for cleaning equipment necessary to run the line. Ie. hoppers, blenders and bins. They will learn labelling and what paperwork is required. They will be certified on the forklift to move goods around the extrusion floor. The Assistant Tech must follow directions willingly and to the best of their ability. They must be a team player. There is also a physical component for this position. Material handling is available to do all heavy loading / lifting. The Assistant Tech must be capable of climbing ladders to load materials and to handle containers that weigh up to 35 Lbs on a regular basis or containers that can weigh up to 50 Lbs on an infrequent basis. The Assistant Tech is responsible for housekeeping in their area and following All safety policies and procedures, plus recommending changes to enhance equipment performance and improve safety |
Essential functions |
Equipment Knowledge
Sheeter and Shear
Winder
Raw Material Handling 1. Material In Staging Area – transporting material from your designate staging area as directed.
Scrap Grinding
Start Up Procedure Prep line for start up, wiping down pin rolls, setting up trim winders, setting up the correct skid for finish product, etc.
Area Clean Up
|
|
|
|
|