Responsibility for supporting of Hydraulic systems with site installation, maintenance and repair as below.
- Summary of material input status of completed construction and update to optimal BOM before operation.
- If it is necessary to check the port of hydraulic components, proceed with a drawing review and request an order for fastening fittings.
- In case of problems such as drawings, specifications, materials, etc. for Project progress, issues to the engineering and results are drawn for resolution.
- Additionally, performing Hydraulic Commission work.